桥梁维修工程)

专项施工方案

编制单位:

**建设集团有限公司

编制人:

审核人:

审批人:

编制日期:

二〇一四年月

1······························································································第一章编制依据··········1··························································································第二章工程概况···············1·······················································································第一节工程概况及地理位置

1····················································································第三章施工部署····················1···············································································第一节·人员组织··················2···························································第二节··················施工准备·····················2······································第三节···································材料用量计划···················3························第四节··············································劳动力需用计划···················4···········第五节························································主要施工机具计划···················4···第六节······························································主要施工进度计划·····················4······························································第四章施工工艺、方法和技术························4···························································第一节处理方案···········································

1.B2桥根据设计提出的桥梁现状病害,桥维修内容如下4··························································桥根据设计提出的桥梁现状病害,桥维修内容如下:

2.B65··························································5···················································第二节维修材料及指标··········································

混凝土1.5·················································································································································钢材2.5·····················································································································································浆砌片石3.5·············································································································································.注入水泥原浆45···································································································································.垫层砾(碎石)55·······························································································································5······················································第三节施工工艺、方法和技术要求························

.墩台基础处理5····································································································1·······························.墩台身处理7···················································································2····················································.上部结构8······································································································································3·····4.附属设施01·······································································································································10································································第五章施工工期保障措施···························10·················································································施工组织实施的保障第一节···

11····································劳动力、材料、设备供应保障第二节····································

1

11·····································································第六章保证质量的技术组织措施·········11··································································第一节建立健全质量保证体系············11····················································第二节············确保工程质量的措施·················12··································第三节···························施工中材料质量的保证措施···········13··························第四节·································成品保护措施·······························13························································第七章安全保障制度········································13·····················································第一节安全保证目标········································

13·················································安全保证体系第二节············································

15··············································第三节施工安全保证措施·········································

15···········································机具设备安全保证措施第四节······································

16···················································································第五节应注意的安全事项·····

17·············································································第八章夏季施工措施···················17·······································································第一节夏季施工的组织管理·············

17·································································第二节雨季施工措施·····························

17···························································第三节夏季施工措施···································

17·····················································第九章现场文明施工措施·····································18···············································第十章施工现场环境保护措施·····································18·········································第一节防止破坏景观生态的保护措施································

18····································施工现场及临设环境卫生措施····································第二节

19·······························第十一章施工现场消防保卫、料俱、突发事故处理措施·····················19·························································第一节现场施工管理措施······························

19·············································施工现场料具管理措施第二节····································

19······································································突发事故处理措施第三节·················

22···············································B2附一桥现状示意图:

···········································

23···············································桥现状示意图:

B6附二···········································

2

第一章编制依据

1.施工单位与建设单位签订的施工合同;

2.本工程的招标文件;

3.适用本工程的其他国家标准。

4.《城市桥梁工程施工与质量验收规范》(CJJ2-2008);

5.《定安县南丽湖冷泉高尔夫球场桥梁工程》设计文件及图纸;

6.《施工现场临时用电安全技术规范》(JGJ46-2005);

7、《钢筋混凝土用钢第一部分:

热扎光圈钢筋》(GB1499.1-2008)和《钢筋混凝土用钢第二部分:

热扎带筋钢筋》(GB1499.2-2007);

9、《公路桥涵施工技术规范》(JTG/TF50-2001);

第二章工程概况

第一节工程概况及地理位置

1.**为一现状桥梁,B2桥为两跨盖板涵,台身及基础为浆砌片石结构,基础受洪水冲击出现缺陷,台后塌方泥土流失;B6桥为11孔土路面石拱桥,墩台基础为浆砌片石扩大基础。

7、8号桥墩迎水面受洪水冲击,断面毁损已经接近50%,桥面坑洼不平,拱圈及墩身出现松散现象。

2.*******镇境内,本工程为景区内道路,桥梁为跨越天然排洪小溪和**湖泄洪主河流。

第二节维修设计标准

B2桥:

1、行车速度:

15km/h。

2、设计荷载:

公路Ⅱ级折减(折减系数为0.8)。

3、设计基准期:

100年。

4、结构环境类别:

Ⅱ类

5、行车道:

单车道。

6、限载:

15t。

B6桥:

2。

3.45kPa/m1、设计荷载:

人群荷载2、设计基准期:

100年。

3、结构环境类别:

Ⅱ类。

4、设计洪水频率:

漫水桥。

第三章施工部署

第一节人员组织

1

根据本工程的特点,结合我单位进行类似工程的丰富经验,公司将安排一个有专业石匠、风钻工、模板工、混凝土工和钢筋工的专业队伍。

指派有相关经验的施工技术人员现场精心管理和指导。

在项目部的领导下投入施工生产。

项目领导本着对业主负责对社会负责的态度,确保相邻单位和配套工程的道路畅通,服从建设单位及现场监理的管理,从严控制工程质量,同时抓好安全生产和文明施工,责任到人,实行目标管理,精心组织施工,以一流的质量回报业主。

以一个整体素质优良、质量进度意识强、经营管理水平高的形象展开对本工程的组织、指挥。

要求施工作业人员具有工种上岗证和相应的岗位职称,有胜任本工程管理的能力承担工程施工任务。

在项目经理的领导下,各岗位人员分工明确,责任明确。

第二节施工准备

1.根据工程进度计划、工程量、施工现场实际情况,做好人员、机械设备及物料进场工作,班组操作人员必须经过培训方可上岗,特殊工种操作人员持证上岗。

2.施工前项目总工组织施工技术员、质量检查员、测量员、安全员等有关人员认真熟悉施工图纸及有关技术资料,结合现场实际情况掌握施工的重点、难点,提出设计中存在的问题,为图纸自审、会审做好准备。

3.施工前技术负责人向操作人员详细技术交底,使全体操作人员领会设计意图,明明白白操作。

4.必须熟悉技术规范、标准及施工方法。

5.提前进行原材料的采样送检试验,为施工中的材料供应奠定基础。

第三节材料用量计划

垫层级配碎石(砂砾)、片石、钢筋、混凝土、水泥等在开工前十天洽谈妥善,并在开工前三天将水泥、石料、钢筋进入现场。

据现场调查,已对B2、B6桥维修工程数量做了汇总,请各有关方面人员核实,以便于采购和对施工班组发包。

2

材料工程数量表

序号项目单位数量备81.6碎石(砂砾148.片m4479.1钢12.46mC35混凝239.64mC35片石混凝闸m1.C35钢纤维混凝4.4mC20混凝56M15砂m52.φ38成52.注10.1:

1原浆水151钢埋在砼41扣21顶215.m1河床土挖43清洗岩m139.桥面土挖m1141桥面清m391勾m89.0m2拱圈批32锥坡清mm2锥坡挖2m2锥坡及台后填4m2道路设12桥梁标212围314.41k2护栏不锈钢复合15.8k2护栏基座钢2φ5PVC2.m3水泥稳定

劳动力需用计划第四节根据施工计划针对技术工种,B2和B6桥准备穿插安排施工,计划总人数17人。

B2、B6维修桥用工计划表

序号工种人数备注

21现场管理人员21试验工

32风钻工1注浆工4

5石匠2

模板工61

7电工1

挖机手81

9钢筋工2

混凝土工210

111普工汽车司机12

1

3

第五节主要施工机具计划

机械准备:

对所有施工机械进行全面的清洁、保养、调试、检查和维修。

并配齐了生产施工过程中部分机械的易损备件,保证各类机械运转处于良好状态。

施工机具进场表

序机械名单数备

1挖1

12空压

1风钻3

4注浆1

5抽水1

16振捣器7台木工机1

8钢筋切断机1台

1台9电焊机

台110弯铁机

辆1

泥头车11

计划主要施工进度第六节

1.围堰及基础2014年2月16日~2014年2月19日4

2.墩台身注浆:

2014年2月18日~2014年2月23日6

3.墩台身加固:

2014年2月21日~2014年2月26日6

4.桥面及护栏:

2014年2月27日~2014年3月10日12

5.附属结构:

2014年3月5日~2014年3月15日11

施工进度计划横道图(总工期28天)

第四章施工工艺、方法和技术

第一节处理方案

1.B2桥根据设计提出的桥梁现状病害,桥维修内容如下:

(1)新增桥面板跨越涵洞,搁置于原旧板上,增强结构均衡受力。

(2)台后护砌段重新砌筑,设置锥坡,增加河道铺砌层。

(3)对墩台身重新勾缝。

(4)清除桥梁范围内杂物。

4

(5)加强桥梁范围内排水工作。

2.B6桥根据设计提出的桥梁现状病害,桥维修内容如下:

(1)更换桥面填料。

(2)对拱圈孔洞进行注浆加固,勾缝均进行重新施工,拱圈下表面进行抹面。

(3)对墩台身注浆加固,重新勾缝。

(4)对墩台基础重新注浆后,设置整体基础。

(5)硬化河道,增设桥台锥坡。

(6)河道迎水侧设置防护体。

第二节维修材料及指标

1.混凝土

C35砼:

桥面板、栏杆座。

3。

75Kg/mC35钢纤维砼:

拱上填料,钢纤维含量为

C35片石混凝土:

基础、河道铺砌。

C20混凝土:

河道铺砌。

3,最大水灰比为0.5混凝土要求最小水泥用量不小于300kg/m,混凝土最大氯离3。

3Kg/m子含量不得大于0.15%,最大含碱量为2.钢材

钢筋:

HPB300钢筋应符合国家标准《钢筋混凝土用钢-热轧光圆钢筋》(GB1499.1-2008)的规定,HRB400钢筋应符合国家标准《钢筋混凝土用钢-热轧带肋钢筋》(GB1499.2-2007)的规定。

钢板:

应采用《碳素结构钢》(GB/T700-2006)规定的Q235-B钢板。

3.浆砌片石

M7.5浆砌片石:

锥坡,石材强度等级为MU30。

4.注入水泥原浆

.垫层砾(碎石)5施工工艺、方法和技术要求第三节

.墩台基础处理1)处理原则(1a加强墩台基础的整体性。

减少水流对基础的冲刷。

b不减少过桥断面的过水面积。

c应减少对原结构损伤。

d扩大基础加固

(2)施工步骤如下:

a1)施工围堰,排水;河道清理、整平硬化减少流水阻力;)基础表面的松散砂浆、浮渣、杂物等清洗干净;缝隙内部未能清洗部位用高25

压水枪冲洗。

3)对裂缝处填筑合适大小块石,并采用快速凝固防水砂浆进行外层封闭处理;

4)采用小孔道注浆法对基础加固;

5)墩台基础采用C35片石混凝土连成整体。

b材料要求

1)片石石材要求结构密实、质地均匀、不易风化且其抗压强度不低于30MPa,片石的尺寸不小于15~25cm,其中一边应大于30cm。

2)砂浆强度不低于M10;

3)水泥应采用高品质的强度等级为42.5的硅酸盐水泥。

c施工工艺

1)小孔道注浆

对处理范围内裂缝进行普查并对裂缝宽度、长度及裂缝数量进行标记和记录。

墩台为砌体结构,结构较为松散,采用小孔道低压注浆加固。

在墩台钻25~38mm小孔,横向间距90~120cm。

小孔道为低压注浆0~0.5MPa,仅在孔道注浆量小时,可适当采取加压措施,但是最大出口压力应小于0.8MPa。

为了达到较好的加固效果,每个注浆孔应分2~3

次间歇注浆,注浆间歇时间取45分钟,注浆过程中应随时注意注浆压力的变化。

注浆过程中出现注浆终止条件中的一条,就可以终止注浆工序:

Ⅰ、注浆稳定压力达到设计要求,可终止。

Ⅱ、注浆孔附近砌缝开始大量冒浆,或附近注浆孔开始出现喷浆现象,在出现上述现象后,经间歇反复3~5次注浆仍存在,可终止。

2)片石基础施工

原来部分基础未连接成整体,新增片石混凝土将原基础连接成一个整体,片石掺入量不超过混凝土体积的20%,片石应具体抗风化及抗侵蚀性。

d