国际BOT合同英文Word文档格式.docx
《国际BOT合同英文Word文档格式.docx》由会员分享,可在线阅读,更多相关《国际BOT合同英文Word文档格式.docx(24页珍藏版)》请在冰豆网上搜索。
theProject"
)bywayofjointfinancingbetweenCandB(socalledBOT).
Whereas,theloanagreement,guaranteeagreement,letterofguarantee,
etc.shallconstituteintegralcomponentsofthisAgreement.TheProject'
s
installedcapacityis__________.
Nowtherefore,thepartiesherebyagreeasfollows:
1.DefinitionandInterpretation
Project"
meanstheplanning,feasibilitystudy,designand
engineering,construction,equipping,completion,testing,commissioning
andoperationoftheinfrastructureproject.
ProjectCost"
meansthecostspecifiedinClause3.
OperationPeriod"
meanstheperiodspecifiedinClause10.1fromthe
startingdateofcommercialoperationoftheinfrastructureproject.
CompletionDate"
meansthedayuponwhichCcertifiesthatthe
infrastructureprojecthassuccessfullycompleteditstestingandcan
startOperationPeriod.
ForceMajeure"
shallhavethemeaningspecifiedinClause16.
ProjectScope"
meansthescopeofsupplyandservicesofCin
connectionwiththeexecutionoftheProjectasdescribedinAnnex2.
Site"
meansthesitefortheinfrastructureprojectincluding
___________,specialroads,andotherareasforconstructionasspecified
inAnnex2.
TransferDate"
meansthedayfollowingthelastdayoftheOperation
Period.
NewCompany"
meanstheCompanytobeestablishedbetweenCand
________entityasspecifiedinClause5.
InvestmentAgreement"
meanstheAgreementonMutualEncouragementand
ProtectionofInvestmentbetweentheGovernmentofthePeople'
sRepublic
ofChinaandtheGovernmentofthe___________.
ExclusiveRight"
meansthespecialpowergrantedtoCorNewCompany
intheMemorandum,Agreementanditsannex.
Day"
meansthesolarcalendarday.
2.TheProject
2.1TheProjectshallbenamedas"
________"
.
2.2Theinfrastructureprojectisintendedtobelocatedat
__________.Theexactlocationoftheinfrastructureprojectmaybe
adjustedatthestageofdetaileddesigninconsiderationofthesite
condition.
2.3TheProjectshallbeimplementedonBuilding,Operationand
TransferBasis.
2.4TheProjectshallbecomposedof____________________,_________,
_________,thedetailsofwhichshallbeasattachedAnnex2-Scopeof
theProject.
2.5Thefinalfeasibilitystudyreportanddetaileddesignafter
acceptanceofBandCshallformbasisforthedevelopmentandcompletion
oftheProject.
3.TheProjectCost
3.1Theprojectcostis$______,interestoftheconstructionperiod
is$______,thetotalprojectcostis$__________,andthedetailsof
whichareshowninAnnex3-ProjectCost.
3.2Thetotalprojectcostshallcomprisebutnotlimitedtothe
followingcostsandthedetailsoftheprojectcostshallbeasattached
Annex3-ProjectCost:
1)Costforfeasibilitystudy,designandengineeringandother
consultingservices;
2)Costforconstructionandinstallation;
3)Costforpurchasingequipmentandmaterials;
4)Costforadministrationincludingoverseasexpenses;
5)Overheadandmiscellaneousexpenses;
6)Contingencies;
7)Interestduringtheconstructionperiod(__________%perannumplus
bankcommission);
8)Premiumforconstructioninsuranceandexportcreditinsurance.
3.3TheProjectCostshallbebasedonthefeasibilitystudyreport
andincaseofasubstantialvariationininvestmentarisingfromgeologic
reasons,theadditionalparttotheProjectCostshallbeapprovedbyB.
Anadditionalinvestmentagreementorcontractshouldbeconcludedbetween
BandC.
4.ResponsibilitiesforProjectExecution
4.1Cshallberesponsibleforthefollowingprovidedthatifand
afterNewCompanyisestablished,responsibilitiesshallbetransferredto
NewCompanyandbesharedbythemembersofNewCompany:
1)thedesignandengineering,procurement,constructionand
commissioningoftheProject;
2)allcostsinconnectionwiththebuildingoftheinfrastructure
projectandthearrangementofallnecessaryfunding;
3)operationoftheinfrastructureproject;
4)transferoftheinfrastructureprojecttoBontheTransferDate;
4.2Bshallberesponsiblefor:
1)thearrangementof:
theprovisionofallnecessarydevelopmentapprovals,permits,
consents,siteleases,accessandotherrightsforCorNewCompany
togetherwiththefulfillmentofessentialrequirementssuchascompany
registration,importlicenseandexemptionofcustomsdutiesandthelike;
theprovisionofallnecessaryordesirableaidsforCtoobtainthe
loan;
obtainingofallregulatory,statutoryandotherconsents,approvals,
authorizations,taxconcessionsandinvestmentincentivesasdescribed
hereinafterwhicharenecessaryordesirablefortheimplementationofthe
Project;
obtainingofallnecessarypermitsandapprovalsfromtherelevant
_____________authoritiesforCorNewCompanytorepatriatecapitaland
dividendsinUSDollarsfrom______;
obtainingofresidentvisas,workpermitsandothernecessaryapprovalsfromtherelevantauthoritiesforCorNewCompany'
spersonnel,
design,manufacturing,installationandconstructionpersonnelaswellas
theirdirectrelativesincludingthetravelin___________;
theprovisionofallnecessaryapprovalsandpermitsrelatingtoextensionoftheinfrastructureprojectandtheProjectfacilitiesinordertoincrease_________________productionifCorNewCompanyintends
todoso;
theprovisionofallnecessarysecuritymeasuresforconstructionand
operationpersonnelandProjectfacilitiestilltheTransferDate;
theprovisionofcommunicationsandtransportfacilitiesoftheProjectconstructionandtheoperationoftheinfrastructureproject;
2)theassistanceintheoperationoftheinfrastructureproject.
3)providingCand/orNewCompanywithfreeuseoftheSite,including
butnotlimitedtotheareaofconstructionsite,accessroad,
transmissionlinerightofway,__________andetc.
4)thenegotiationandconclusionofserviceagreementwith
___________Governmentorothercountries'
governmentsjointlywithCor
newCompany,thePeople'
sInsuranceCompanyofChinarepresentatives,
whosepresenceinthenegotiationBshallensure,andwhoseapprovalB
Shallobtain;
5)theexportationof________________percentof__________produced
bytheinfrastructureprojectto__________oranythirdcountry;
6)theassignmentofitsrepresentativesatSiteandtotheNew
CompanytoassistCorNewCompanyandmakenecessarycoordinationbetween
BandCorNewCompany.
4.3BensuresthattheOperationPeriodoftheProjectshallbenot
lessthan_______years.HoweverifIRR(InterRateofReturn)doesnot
reach_______percent,bothpartieswilldiscusstheproperextensionof
theOperationPerioduntiltheyearIRRreaches_______%.
4.4ConditionsPrecedent
Bshallberesponsiblefortheprovisionofthefollowingdocuments
forCtomakeavailableanypartofthisAgreementwithin_______months
fromthedateofsigningthisAgreementandsuchdocumentsshallbevalid
andeffectivetoNewCompany:
1)apowerguaranteeissuedby___________________parliament
acceptabletoCintheformdefinedinAnnex7,whichshallbereturnedto
BontheTransferDate;
2)warrantytobeissuedandloanagreementtobeconcludedwiththe
proposalmadebyBforbearing__________percentoftheProjectCost,the
Bankof______________astheloaneeand__________FinanceMinistryasthe
guarantorandacceptabletotheBankofChinaandthePeople'
sInsurance
CompanyofChina,andaletterofcreditorletterofguaranteetobe
issuedasrequiredbytheBankofChinaprovidedthatthelengthof
maturityis__________yearsincludinga_______yearconstructionperiod
andloaninterestis________percentperannum;
Bmaymakeearlier
reimbursement;
3)loanguaranteeandwarrantyforC'
ssharing__________%ofthe
ProjectCostincludinginterestoftheconstructionperiodtobeissuedby
theBankof_____________and______________FinanceMinistryrespectively,
acceptabletothePeople'
sInsuranceCompanyofChinaandtheLendingBank
andvaliduntiltotheTransferDate(__________),providingallnecessary
assistanceinenablingCtoobtaintheloanfrominternationalprime
banks;
4)thelegalcertificateissuedby_____________PresidentofSupreme
Courtandthelegalcertificateissuedby______________Procurator
General,certifyingthatthisAgreementshallbevalidandenforceable
underthelawsof_____________ineveryrespectintheformdefinedin
Annex8;
thecertificateofapprovalissuedbytheGovernmentof
_____________,certifyingthattheProjectislawfulandlegitimate;
5)Bshallpermittheconstructionmachinery,materialandequipment
necessaryfortheProjecttobetransportedinto__________via
_____________bysea,and/orbyroadthrough__________asWellasbyair,
ensuringfacilitiesfromthe__________bordercontrolandcustoms
authorities.
4.5BwarrantsandundertakesthatBshallnotchangeorpermitothers
tochangetheenvironmentoftheSitewhichadverselyaffectsthe
constructionoroperationoftheProject.Suchchangeshallinclude,but
notlimitedto,_____________.
4.6Buyer'
sCreditforB'
ssharing__________%oftheProjectCost
shallbeprovidedbytheChineseside,paymentter