safetyplan中港文档格式.docx
《safetyplan中港文档格式.docx》由会员分享,可在线阅读,更多相关《safetyplan中港文档格式.docx(69页珍藏版)》请在冰豆网上搜索。
1.4StatutoryandContractualSafetyObligations
2.CompanySafetyPolicy9
2.1General
2.2Functions
2.3Standards
2.4Target
3.SafetyStaffOrganizationandIndividualResponsibilities11
3.0SiteSafetyOrganizationChart
3.1IndividualResponsibilities
3.1.1ManagingDirector
3.1.2SafetySectioninHeadOffice
3.1.3ProjectManager
3.1.4DeputyProjectManager
3.1.5SiteAgent
3.1.6SiteEngineer
3.1.7Foreman
3.1.8Plant,MachineryandMechanicsSupervisor
3.1.9OperativesandWorkGroup
3.1.10SafetyOfficer
3.1.11SafetySupervisor
3.1.12FirstAider
3.1.13Sub-contractors
3.1.14SafetyRepresentative
4.SafetyTraining20
4.1SafetyTrainingProgramme
4.2TrainingSyllabus
4.3MonitoringforEffectivenessofSafetyTraining
4.4ReviewofSafetyTrainingProgramme
4.5TrainingRecord
5.In-HouseSafetyRulesandRegulations25
5.1GeneralSiteRules
5.2PermittoWorkSystem
5.3MethodStatement
5.4Guidancefortheselectionofplant
5.5DisciplinaryAction
6.SafetyCommittees27
6.1SiteSafetyManagementCommittee
6.2SiteSafetyCommittee(SSC)
6.3Liaisonwithclientandsubcontractors
6.4ImplementationandMonitoring
7.ProgrammeForInspectionofHazardsConditions29
7.1SafetyInspectionProgrammes
7.2AppointmentandResponsibilitiesofCompetentPersons
7.3Records,CertificatesandRegisters
7.4Follow-upActionandMonitoring
7.5AnalyzetheResultofSafetyInspection
7.6SafetyAudit
8.JobHazardAnalysis32
8.1IdentificationofActivitiesRequireRiskAssessment
8.2IdentifiedPotentialHazardActivities
8.3RiskAssessment
8.4Methodology
8.5Follow-upAction
8.6MonitorandReview
8.7HazardAnalysisMatrix
9.PersonalProtectionProgramme35
9.1IdentificationofPPERequirementsfortheProject
9.2Assurance
9.3Use,storageandmaintenance
9.4InstructionandTraining
9.5InventoryandRecordforIssue
10.Accident/IncidentInvestigation37
10.1ReportingforAccidentsandDangerousOccurrences
10.2InvestigationofAccidentandDangerousOccurrences
10.3AccidentInvestigators
10.4Follow-upAction
10.5CausesandTrendsAnalysis
10.6MaintenanceofInvestigationReport
10.7EmergencyFlowChart
11EmergencyPreparedness40
11.1GeneralEmergencyProcedures
11.2EmergencyProceduresforBodilyInjuries
11.3InformationtobeGivenWhileDialling999
11.4FireProcedures
11.5Evacuation,SearchandRescue
11.6TyphoonandHeavyRainstormProcedure
11.7HeavyRainstormsProcedures
11.8TraininginEmergencyProcedures
11.9ProgrammeforTestingofEmergency
11.10Emergency/RescueTeam
11.11FirstAidArrangement
12SafetyPromotion48
12.1SafetyInformationCommunication
12.2ContentsofSafetyNoticeBoard
12.3PromotionActivitiesProgramme
13HealthAssuranceProgramme50
13.1HealthHazardsProcess
13.2ControlofHazardstoHealth
13.3Welfare
13.4ControlofSubstancesHazardoustoHealth
14Evaluation,SelectionandControlofSubcontractor52
14.1EvaluationandSelection
14.2ControlofSubcontractors
15ProcessControlprogramme53
ManagementofthePlaceofWork
15.1Fireprevention
15.2WorkinConfinedSpaces
15.3Housekeeping
15.4Scaffold,WorkingPlatformandLadder
15.5ExistingUndergroundLiveCable
15.6ProtectionAgainstFallingObjects
15.7HealthandSafetyinOffice
16ProcessControlProgramme58
ManagementofTasksandOperation
16.1LiftingOperation
16.2TemporaryElectricalInstallations
16.3WorkingatHeight
16.4Excavations
16.5Welding
16.6ManualHandling
16.7Piling
17ProcessControlProgramme65
ManagementofEquipmentandPlants
17.1AirReceivers/Compressors
17.2WoodworkingMachinery
17.3AbrasiveWheel
17.4EarthMovingPlant
17.5BarBendingMachine
17.6HandTools
17.7SiteTraffic
Appendix
SiteSafetyInspectionCheckList
1.Introduction
AccordingtoourCompanySafetyPolicy,weaimateliminateaccidentfromourproject,andtoassuresofarasreasonablypracticable,thehealthandsafetyofallpersonnelaresafeguardedfrompotentialhazards.
Inordertomanagingriskatworksystematically,asafetymanagementprogramisestablishedandwhichisdocumentedatthissafetyplan.Thissafetyplanshallbereviewedbytheprojectsafetyofficerfromtimetotimewhennecessary.
1.1GeneralInformation
1.1.1DetailsofClient
TerritoryDevelopmentDepartment,HKSAR
NewTerritory’sEastDepartmentOffice
Suite1213,ChinachemGoldenPlaza
77ModyRoad,TsimShaTsuiEast,
‘Kowloon.
Tel.23011380
Fax.27218630/27390076
1.1.2DetailsofConsultingEngineer
ManusellConsultantsAsiaLtd.
601WorldCommerceCentre
HarbourCity,11CantonRoad,Kowloon
Tel.23754455
Fax.23756399
1.2ProjectCommencement&
Thecontractcommencementdateofthisprojectis18December1998.
Thecontractcompletiondateofthisprojectwillbe19June2000.
1.3ScopeofWork
1.Rockfill
2.Slopetrimmingandcuttingworks
3.Constructionofsoilnailsandslopeprotectiontreatment
4.Constructionofboredpiles
5.Constructionofretainingwalls
6.Constructionofsurfaceandsub-surfacedrainageworks
7.Rockslopetreatmentworks
8.Temporaryroadworks
1.4StatutoryandContractualSafetyObligations
1.4.1ContractualObligations
ThecompanyshallcomplywithallcontractualrequirementsinregardtoindustrialhealthandsafetyspecifiedintheSpecialConditionofContract.
1.4.2StatutoryObligations
Thecompanyshallcomplywithallrelevantstatutoryrequirements,codesofpractice,suchlegislationasisrelatedtoindustrialhealthandsafety,inparticularbutnotlimitedtothefollowing:
-
a)FactoriesandIndustrialUndertakingOrdinance(F&
IU)anditssubsidiaries,
b)OccupationalHealthandSafetyOrdinanceanditssubsidiaries
c)DangerousGoodsOrdinanceanditssubsidiaries,
d)ElectricityOrdinance&
itssubsidiaries,
e)FireServicesOrdinance&
f)EmployeeCompensationOrdinance&
g)EmploymentOrdinance&
h)AirPollutionControlOrdinance&
itssubsidiaries.
i)NoiseControlOrdinance&
j)WasteDisposalOrdinance&
1.4.3SafetyReports
AmonthlysafetyofficerreportForm2A(F&
IU(SOSS)R)shallbepreparedbythesafetyofficerandsubmittedtotheSiteAgent.CopiestobekeptatthecontractorsiteofficeforER’sinspection.
AweeklysafetysupervisorreportForm3A(F&
IU(SOSS)R)shallbepreparedbythesitesafetysupervisorandsubmittedtotheSiteAgentandSafetyOfficer.CopiestobekeptatthecontractorsiteofficeforER’sinspection.
DangerousOccurrenceReportandWorkmenCompensationReportwillbesubmittedtoLabourDepartmentandcopiedtotheEngineer(ifany).
AMonthlySafetyReportwhichcontainsaccidentstatistics,safetytrainingandsafetypromotionstatus,Plantregister,updatedlistofSafetySupervisorandLabourDepartmentrecommendations,etc.willbepreparedbytheSafetyOfficerandsubmittedtotheEngineer.
AwrittenreportwillbesubmittedtotheEngineerassoonaspossibleofaccidentoccurs,ifany.(DetailsrefertoSection10oftheSafetyPlan)
StatutoryForms
Inordertocomplywithlegalrequirements,particularstatutoryformsarerequiredtoprepareandretainatthesiteofficeasfollows:
-
Description
Frequency
i)Plant(CSSRForm1&
LALGForm1))
Weekly
ii)Excavation(CSSRForm4)
iii)Scaffolding(CSSRForm5)
Bi-weekly
iv)LiftingAppliances(LALGForm3,4,5)
Yearly
v)LiftingGear(LALGForm6,7)
EverySixmonths
vi)Noticeofappointmentofsafetyofficer(Form4)
Afterappointment
vii)Noticeofappointmentofsafetysupervisor(Form5)
viii)AirCompressor(Form2)
Usually18months
ix)SafetySupervisorReport(Form3A)
x)SafetyOfficerReport(Form2A)
Monthly
1.4.4SiteSecurity
Unauthorizedpersonsshallnotbeallowedtoenterthesite.
Alistofthedirectandindirectworkersshallbekeptatthesiteofficeforreference.
Warningsignsprohibitingunauthorizedentrytositeshallbeexhibitedateachentranceandexitofthesiteandatanyotherappropriateplacealongtheboundaryofthesite.AllstaffshouldacttoensurethatNoPersonsunder18yearsoldareallowedonsitewithoutsitemanagementapproval.
Sufficientnumberofwatchmanshallbeappointedtoprotectpropertiesonsite.
Properrecordsshallbekeptofallequipmentandmaterialsbroughtintoortakenawayfromthesite.
AnyvisitorsshallregistertothesiteofficebeforetheyvisittothesiteandthesuchvisitmustbeescortedbyCHECsitestaff.
2.CompanyHealthandSafetyPolicy
General
ItisthepolicyoftheCompanythatitsoperationsareexecutedatalltimesinsuchawayastoensure,sofarasreasonablypracticable,thehealthandsafetyofallitsemployeesandallpersonslikelytobeaffectedbyitsoperations,includingsubcontractorsandthepublicwhereappropriate,aresafeguardedfromanypotentialhazards.
AlltheCompany’sstaffandworkersandsubcontractorsareresponsibleforensuringhealthandsafet