钢筋混凝土外文翻译文献.docx

上传人:b****8 文档编号:10953095 上传时间:2023-02-23 格式:DOCX 页数:12 大小:26.21KB
下载 相关 举报
钢筋混凝土外文翻译文献.docx_第1页
第1页 / 共12页
钢筋混凝土外文翻译文献.docx_第2页
第2页 / 共12页
钢筋混凝土外文翻译文献.docx_第3页
第3页 / 共12页
钢筋混凝土外文翻译文献.docx_第4页
第4页 / 共12页
钢筋混凝土外文翻译文献.docx_第5页
第5页 / 共12页
点击查看更多>>
下载资源
资源描述

钢筋混凝土外文翻译文献.docx

《钢筋混凝土外文翻译文献.docx》由会员分享,可在线阅读,更多相关《钢筋混凝土外文翻译文献.docx(12页珍藏版)》请在冰豆网上搜索。

钢筋混凝土外文翻译文献.docx

钢筋混凝土外文翻译文献

中英文资料翻译

1外文翻译

1.1ReinforcedConcrete

Plainconcreteisformedfromahardenedmixtureofcement,water,fineaggregate,coarseaggregate(crushedstoneorgravel),air,andoftenotheradmixtures.Theplasticmixisplacedandconsolidatedintheformwork,thencuredtofacilitatetheaccelerationofthechemicalhydrationreactionlfthecement/watermix,resultinginhardenedconcrete.Thefinishedproducthashighcompressivestrength,andlowresistancetotension,suchthatitstensilestrengthisapproximatelyonetenthlfitscompressivestrength.Consequently,tensileandshearreinforcementinthetensileregionsofsectionshastobeprovidedtocompensatefortheweaktensionregionsinthereinforcedconcreteelement.

Itisthisdeviationinthecompositionofareinforcesconcretesectionfromthehomogeneityofstandardwoodorsteelsectionsthatrequiresamodifiedapproachtothebasicprinciplesofstructuraldesign.Thetwocomponentsoftheheterogeneousreinforcedconcretesectionaretobesoarrangedandproportionedthatoptimaluseismadeofthematerialsinvolved.Thisispossiblebecauseconcretecaneasilybegivenanydesiredshapebyplacingandcompactingthewetmixtureoftheconstituentingredientsareproperlyproportioned,thefinishedproductbecomesstrong,durable,and,incombinationwiththereinforcingbars,adaptableforuseasmainmembersofanystructuralsystem.

Thetechniquesnecessaryforplacingconcretedependonthetypeofmembertobecast:

thatis,whetheritisacolumn,abean,awall,aslab,afoundation.amasscolumns,oranextensionofpreviouslyplacedandhardenedconcrete.Forbeams,columns,andwalls,theformsshouldbewelloiledaftercleaningthem,andthereinforcementshouldbeclearedofrustandotherharmfulmaterials.Infoundations,theearthshouldbecompactedandthoroughlymoistenedtoabout6in.indepthtoavoidabsorptionofthemoisturepresentinthewetconcrete.Concreteshouldalwaysbeplacedinhorizontallayerswhicharecompactedbymeansofhighfrequencypower-drivenvibratorsofeithertheimmersionorexternaltype,asthecaserequires,unlessitisplacedbypumping.Itmustbekeptinmind,however,thatovervibrationcanbeharmfulsinceitcouldcausesegregationoftheaggregateandbleedingoftheconcrete.

Hydrationofthecementtakesplaceinthepresenceofmoistureattemperaturesabove50°F.Itisnecessarytomaintainsuchaconditioninorderthatthechemicalhydrationreactioncantakeplace.Ifdryingistoorapid,surfacecrackingtakesplace.Thiswouldresultinreductionofconcretestrengthduetocrackingaswellasthefailuretoattainfullchemicalhydration.

Itisclearthatalargenumberofparametershavetobedealtwithinproportioningareinforcedconcreteelement,suchasgeometricalwidth,depth,areaofreinforcement,steelstrain,concretestrain,steelstress,andsoon.Consequently,trialandadjustmentisnecessaryinthechoiceofconcretesections,withassumptionsbasedonconditionsatsite,availabilityoftheconstituentmaterials,particulardemandsoftheowners,architecturalandheadroomrequirements,theapplicablecodes,andenvironmentalreinforcedconcreteisoftenasite-constructedcomposite,incontrasttothestandardmill-fabricatedbeamandcolumnsectionsinsteelstructures.

Atrialsectionhastobechosenforeachcriticallocationinastructuralsystem.Thetrialsectionhastobeanalyzedtodetermineifitsnominalresistingstrengthisadequatetocarrytheappliedfactoredload.Sincemorethanonetrialisoftennecessarytoarriveattherequiredsection,thefirstdesigninputstepgeneratesintoaseriesoftrial-and-adjustmentanalyses.

Thetrial-and–adjustmentproceduresforthechoiceofaconcretesectionleadtotheconvergenceofanalysisanddesign.Henceeverydesignisananalysisonceatrialsectionischosen.Theavailabilityofhandbooks,charts,andpersonalcomputersandprogramssupportsthisapproachasamoreefficient,compact,andspeedyinstructionalmethodcomparedwiththetraditionalapproachoftreatingtheanalysisofreinforcedconcreteseparatelyfrompuredesign.

1.2Earthwork

Becauseearthmovingmethodsandcostschangemorequicklythanthoseinanyotherbranchofcivilengineering,thisisafieldwheretherearerealopportunitiesfortheenthusiast.In1935mostofthemethodsnowinuseforcarryingandexcavatingearthwithrubber-tyredequipmentdidnotexist.Mostearthwasmovedbynarrowrailtrack,nowrelativelyrare,andthemainmethodsofexcavation,withfaceshovel,backacter,ordraglineorgrab,thoughtheyarestillwidelyusedareonlyafewofthemanycurrentmethods.Tokeephisknowledgeofearthmovingequipmentuptodateanengineermustthereforespendtinestudyingmodernmachines.Generallytheonlyreliableup-to-dateinformationonexcavators,loadersandtransportisobtainablefromthemakers.

Earthworksorearthmovingmeanscuttingintogroundwhereitssurfaceistoohigh(cuts),anddumpingtheearthinotherplaceswherethesurfaceistoolow(fills).Toreduceearthworkcosts,thevolumeofthefillsshouldbeequaltothevolumeofthecutsandwhereverpossiblethecutsshouldbeplacedneartofillsofequalvolumesoastoreducetransportanddoublehandlingofthefill.Thisworkofearthworkdesignfallsontheengineerwholaysouttheroadsinceitisthelayoutoftheearthworkmorethananythingelsewhichdecidesitscheapness.Fromtheavailablemapsahdlevels,theengineeringmusttrytoreachasmanydecisionsaspossibleinthedrawingofficebydrawingcrosssectionsoftheearthwork.Onthesitewhenfurtherinformationbecomesavailablehecanmakechangesinjissectionsandlayout,butthedrawinglfficeworkwillnothavebeenlost.Itwillhavehelpedhimtoreachthebestsolutionintheshortesttime.

Thecheapestwayofmovingearthistotakeitdirectlyoutofthecutanddropitasfillwiththesamemachine.Thisisnotalwayspossible,butwhenitcanbedoneitisideal,beingbothquickandcheap.Draglines,bulldozersandfaceshovelsandothis.Thelargestradiusisobtainedwiththedragline,andthelargesttonnageofearthismovedbythebulldozer,thoughonlyovershortdistances.Thedisadvantagesofthedraglinearethatitmustdigbelowitself,itcannotdigwithforceintocompactedmaterial,itcannotdigonsteepslopws,anditsdumpinganddiggingarenotaccurate.

Faceshovelsarebetweenbulldozersanddraglines,havingalargerradiusofactionthanbulldozersbutlessthandraglines.Theyareanletodigintoaverticalclifffaceinawaywhichwouldbedangeroustorabulldozeroperatorandimpossibleforadragline.Eachpieceofequipmentshouldbeleveloftheirtracksandfordeepdigsincompactmaterialabackacterismostuseful,butitsdumpingradiusisconsiderablylessthanthatofthesameescavatorfittedwithafaceshovel.

Rubber-tyredbowlscrapersareindispensableforfairlyleveldiggingwherethedistanceoftransportistoomuchtoradraglineorfaceshovel.Theycandigthematerialdeeply(butonlybelowthemselves)toafairlyflatsurface,carryithundredsofmetersifneedbe,thendropitandlevelitroughlyduringthedumping.Forharddiggingitisoftenfoundeconomicaltokeepapushertractor(wheeledortracked)onthediggingsite,topusheachscraperasitreturnstodig.Assoonasthescraperisfull,thepushertractorreturnstothebeginningofthedigtoheoptohelpthenestscraper.

Bowlscrapersareoftenextremelypowerfulmachines;manymakersbuildscrapersof8cubicmetersstruckcapacity,whichcarry10m³heaped.Thelargestself-propelledscrapersareof19m³struckcapacity(25m³heaped)andtheyaredrivenbyatractorengineof430horse-powers.

Dumpersareprobablythecommonestrubber-tyredtransportsincetheycanalsoconvenientlybeusedforcarryingconcreteorotherbuildingmaterials.Dumpershavetheearthcontaineroverthefrontaxleonlargerubber-tyredwheels,andthecontainertipsforwardsonmosttypes,thoughinarticulateddumpersthedirectionoftipcanbewidelyvaried.Thesmallestdumpershaveacapacityofabout0.5m³,andthelargeststandardtypesareofabout4.5m³.Specialtypesincludetheself-loadingdumperofupto4m³andthearticulatedtypeofabout0.5m³.Thedistinctionbetweendumpersanddumptrucksmustberemembered.dumperstipforwardsandthedriversitsbehindtheload.Dumptrucksareheavy,strengthenedtippinglorries,thedrivertravelsinfrontlftheloadandtheloadisdumpedbehindhim,sotheyaresometimescalledrear-dumptrucks.

1.3SafetyofStructures

Theprincipalscopeofspecificationsistoprovidegeneralprinciplesandcomputationalmethodsinordertoverifysafetyofstructures.The“safetyfactor”,whichaccordingtomoderntrendsisindependentofthenatureandcombinationofthematerialsused,canusuallybedefinedastheratiobetweentheconditions.Thisratioisalsoproportionaltotheinverseoftheprobability(risk)offailureofthestructure.

Failurehastobeconsiderednotonlyasoverallcollapseofthestructurebutalsoasunserviceabilityor,accordingtoamoreprecise.Commondefinition.Asthereachingofa“limitstate”whichcausestheconstructionnottoaccomplishthetaskitwasdesignedfor.Therearetwocategoriesoflimitstate:

(1)Ultimatelimitsate,whichcorrespondstothehighestvalueoftheload-bearingcapacity.Examplesincludelocalbucklingorglobalinstabilityofthestructure;failureofsomesectionsandsubsequenttransformationofthestructureintoamechanism;failurebyfatigue;elasticorplasticdeformationorcreepthatcauseasubstantialchangeofthegeometryofthe

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 高等教育 > 经济学

copyright@ 2008-2022 冰豆网网站版权所有

经营许可证编号:鄂ICP备2022015515号-1